Mercedes-Benz Trucks · Electric Construction Truck

eArocs 400

Battery-electric 8x4 construction truck with 414 kWh LFP battery, up to 240 km range, and power take-off for electrified bodies such as tippers and transit mixers.

Wörth am Rhein Electric 380 kW 414 kWh LFP up to 240 km Wörth
Visit Mercedes-Benz Trucks eArocs 400
Mercedes-Benz Trucks eArocs 400

Bildnachweise: © Copyright Daimler Truck AG, Wörth am Rhein (Deutschland)

The Mercedes-Benz eArocs 400 is the first fully electric construction truck from Mercedes-Benz Trucks, bringing battery-electric drive to the job site. As a four-axle vehicle (8x4/4) with two LFP battery packs and 414 kWh of installed capacity, it achieves up to 240 km as a tipper or 200 km as a drum mixer — enough for a full work shift without intermediate charging. The central electric motor with integrated 3-speed transmission delivers 380 kW continuous and 450 kW peak output; the 800-volt architecture supports CCS2 charging at up to 400 kW via charging sockets on both sides of the vehicle (10–80% in approximately 46 minutes). A power take-off from the second-generation electric truck platform powers electrified bodies such as the fully electric drum mixer CIFA Energya E10 or the Liebherr HTM 905. Following its world premiere at bauma 2025, the eArocs 400 has been available to order since April 2026; the base vehicle will be produced from the third quarter of 2026 at the Mercedes-Benz plant in Wörth am Rhein, with the integration of the electric drivetrain handled by Paul Group in Vilshofen, Bavaria.

Specifications

Axle configuration8x4/4 (four-axle)
DrivetrainCentral electric motor with integrated 3-speed transmission
Continuous power380 kW (517 PS)
Peak Power450 kW (612 PS)
Battery Capacity414 kWh installed (2 LFP packs of 207 kWh each)
Board voltage800 Volt
Rangeup to 240 km (tipper), up to 200 km (transit mixer)
Charging Powerup to 400 kW (CCS2, charging sockets on both sides)
Charging time10–80 % in approx. 46 min
Max. permissible gross weight37 or 44 t
Wheelbases4.550 / 4.850 / 5.150 / 5.450 mm
Body variantsTipper, truck mixer (e.g. Liebherr HTM 905, CIFA Energya E10)
Market launchAvailable to order since April 2026, production from Q3 2026
ProductionMercedes-Benz plant Wörth am Rhein (base vehicle); electric drivetrain integration: Paul Group, Vilshofen

Highlights

  • First fully electric construction truck from Mercedes-Benz Trucks — locally CO2-neutral and quiet on the construction site
  • 414 kWh LFP battery in the battery tower behind the cab — a full work shift without interim charging
  • 800-volt architecture with 400 kW CCS2 charging on both sides of the vehicle (10–80% in approx. 46 min)
  • Central electric motor with 3-speed transmission: 380 kW continuous and 450 kW peak output
  • Power take-off for electrified superstructures such as the fully electric truck mixer CIFA Energya E10
  • Active Brake Assist 6, Active Sideguard Assist 2 and Front Guard Assist on board
  • Winter test at −20 °C in Finland successfully completed (February 2026)